PRODUCT INFORMATION
Membrane scaling maintenance technology
- front page
- product
- Water Treatment Technology
- Technology Development Department
- Membrane scaling maintenance technology
Product Information
- heat treatment
-
water treatment
- Arsenic remover
- Desulfurizer
- Deaerator
- Water softener (calcium and magnesium ion removal)
- Carbon filter (removes odor and residual chlorine)
- Sand filter (removal of suspended impurities)
- Iron remover (removal of iron and manganese ions)
- RO water purifier
- Pre-backwash filter
- UV ultraviolet sterilizer
- Ion exchange resin
- reverse osmosis membrane tube
- quick filter
- Various tanks for water treatment
- Various application filter media
- 美國 Clack Clark control valve
- 美國 Fleck Control Valve
- 美國 Pentair Control Valve
- 美國 Autotrol Control Valve
- Runxin Control Valve
- Injection treatment
- Technology Development Department
-
brand
- Demo brand
- US DOW
- IDEX USA
- US CLACK
- EMERSON, USA
- American PENTAIR
- SIEMENS Germany
- American PULSAFEEDER
- Denmark DANFOSS
- Thailand HAYCARB
- France SUNTEC
- UK PUROLITE
- Japanese NOP
- Japan OLYMPIA
- Japan KATSURA
- BRAHMA, Italy
- SAGINOMIYA
- HONEYWELL
- AZBIL (YAMATAKE)
- OLTREMARE
- NIPCON
- TROCHOID
- domestic
- EGO
- KATO
- LECIP
- ATS
- JACOBI
- ETATRON
- WAVE CYBER
- BOSCHINI
- NIPPON
- WL
- CASH ACME
- YAZAKI
- RUNXIN
- About | Contact

Membrane scaling maintenance technology
Technical explanation
Technology to remove and clean filter membrane fouling:
1.) Check and replace the pretreatment equipment (fouling of the filter membrane may be caused by lack of pretreatment or equipment failure). Some common examples are given below, please check and repair these devices as needed:
•Activated carbon powdering
•Water hardness increases (ion exchange resin needs to be replaced)
•Pre-treatment membrane cracking
•The pore size of the pretreatment filter membrane is too coarse
•Mechanical damage inside the pump
•Residual chlorine breakthrough and penetration
2.) Adjust equipment operating conditions (fouling can also be caused by improper system design and maintenance). Scaling can be minimized by implementing one or more of the following steps:
•Reduce recycling percentage
•Reduce system working pressure
•Pre-treatment equipment needs to be replaced more frequently
•Regularly disinfect the system